The steel structure adopts factory production;
After arriving at the site, high-strength bolts are used to connect according to the diagram, which can ensure good bearing performance and shorten the construction period;
The steel structure is arranged on both sides, and the track is installed on the top for the manipulator to walk;
Install the trolley line power supply device to supply power to the manipulator;
The surface of the steel structure is painted with anti-corrosion paint, and the specific color can be based on the requirements of the buyer;
All steel structures have been tested by flaw detection.